Central 40, Chineham Park

Central 40, Chineham Park

Client Overview: 🏢

Chineham Park is a leading business destination in Basingstoke, committed to providing modern, energy-efficient workspaces that support sustainability and innovation. As part of ongoing efforts to future-proof its infrastructure, Chineham Park identified Central 40, a key building on the estate, for a major energy upgrade.

Challenge: 🔍

The existing HVAC infrastructure at Central 40 relied on an aging gas boiler and chiller system, which was inefficient and misaligned with the estate’s sustainability goals. The challenge was to replace this outdated system with a modern, low-carbon solution—without disrupting business continuity or compromising performance.

Solution: ⚡

GreenLight was selected to deliver the mechanical and electrical infrastructure upgrades needed to support a more sustainable energy system.

400A Distribution System Installation: ⚙️

GreenLight installed a new 400A electrical distribution system to support the transition to a Variable Refrigerant Flow (VRF) heating and cooling system—an energy-efficient solution ideal for commercial buildings.

Decommissioning of Gas Systems: 🛠️

The project included the safe removal of the old gas boiler and chiller plant, reducing the building’s reliance on fossil fuels and preparing the site for a cleaner energy profile.

Energy Efficiency and Sustainability Focus: 🌿

The new VRF system enables precise temperature control, reduced energy consumption, and significantly lower emissions, aligning the building with best practices in environmental performance.

Results: ✅

Improved Building Efficiency: Central 40 is now equipped with a state-of-the-art climate control system that enhances comfort while cutting energy use.

Carbon Reduction: Eliminating the gas infrastructure supports Chineham Park’s commitment to achieving a lower carbon footprint.

Future-Ready Infrastructure: The upgrades form part of a broader sustainability roadmap, future-proofing the estate with smart, flexible systems.

Conclusion: 🌍

GreenLight’s successful delivery of energy upgrades at Central 40 showcases our ability to modernize commercial buildings for a greener, more efficient future. With the integration of advanced electrical systems and sustainable HVAC technology, Chineham Park is taking measurable steps toward environmental leadership in the commercial real estate sector.

Renewable Energy Solutions for your Business, From initial design and planning, we can deliver installations and upgrades from design right through to hand over. Our multi-skilled teams are dynamic and get involved in different parts of each project, this approach improves knowledge within the team and makes everything run smoothly.

Contact Us

  • 0208 545 7225

COMPANY ADDRESS

Unit 14, 14 Watermill Way, London SW19 2RD

Hillcrest, Old Road, Harbertonford DEVON | TQ9 7TA

Weaver Street, Chester CHESHIRE | CH1 2LB