fbpx

Malaysian Embassy– Bedford Row

Greenlight Carried out a full M&E Dilapidation and Validation at The Malaysian Embassy’s 8 storey Building in Central London.

The report from the Validation showed poor upkeep of the installation. Greenlight acted quickly to get the building back up to standard, including a full LED upgrade, an overhaul and replacement of much of the Mechanical Plant, Building Management System and Air Conditioning Systems all within the original timeframe set by the client.